» Transportation

Transportation Sector:
The transportation sector includes both a) Highways and Rural road networks and b) Railway networks. Detailed datasheets given below

a) Feasibility Studies

b) Detailed Design

c) Construction Supervision

Feasibility Studies


Assignment Information

Assignment Name:

Feasibility Study of Up-Gradation of existing Railway Line from Rohri To Kohl Taftan Via Quetta Including the Realignment Of

Sibi-Spezand Section (1022 Kms).

ML3-1
Approx. value of the Project (in current US$/PKR): US$: 8.6 Billion
Country: Pakistan
Location within country: Quetta
Duration of assignment (Months): 08
Name of Client: Pakistan Railway
Description of Project:

The national railway network of Pakistan had initially taken shape before independence in 1947. However, due to system, fund, management and such reasons since foundation of the country, the railway construction remained stagnant for a long term. This project is a significant part of China-Pakistan Economic Corridor (CPEC).

Pakistan railway layout is unbalanced, north-south routes are much more than east- west routes. Quetta To Taftan Railway is the only main railway route from east to west in Pakistan, and proposed to be carried out under the China Pakistan Economic Corridor (CPEC), as part of the rehabilitation / upgradation of sections included in ML-3 Project in order to achieve higher level of service.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

Pakistan Railways decided to a carry out a feasibility study for the upgradation/rehabilitation of the track structure for the increased speed of 160 km/hr and axle loads of 25 tonnes.

SES was responsible for carrying out necessary condition surveys works and studies for complete railway infrastructure and system designs required for the preparation of the design reports. All the infrastructure including right of way shall be proposed for double railway track

Upon its reconstruction and expansion, transport capacity and service quality of the railway will be greatly promoted. Then, it will actively promote and improve the development and utilization of land and tourism resources along the line and play a significant role in industrial & agricultural development and optimization & adjustment of industrial layout along the line.

 

Assignment Information

Assignment Name:

Feasibility Study of Rail Link from Quetta to Kotla Jam (538 Kms) (Updating of Existing Feasibility Study).

 ML3-2
Approx. value of the Project (in current US$/PKR): US$: 4.9 Billion
Country: Pakistan
Location within country: Quetta
Duration of assignment (Months): 08
Name of Client: Pakistan Railway
Description of Project:

The national railway network of Pakistan had initially taken shape before independence in 1947. However, due to system, fund, management and such reasons since foundation of the country, the railway construction remained stagnant for a long term. This project is a significant part of China-Pakistan Economic Corridor (CPEC).

Pakistan Railways has now decided to get the existing feasibility study of linking Quetta with Kotla Jam via Bostan, Zhob and D.I. Khan updated, by re-designing the infrastructure for the design speed of 160km/hr and axle load of 25 tonnes.

Improvement of the existing railway track and construction of the new track will greatly shorten down the duration of freight transport, lower down the cost and will definitely have important significance to the economy.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

Pakistan Railways decided to a carry out a feasibility study for the upgradation/rehabilitation of the track structure for the increased speed of 160 km/hr and axle loads of 25 tonnes.

SES was responsible for carrying out necessary condition surveys works and studies for complete railway infrastructure and system designs required for the preparation of the design reports. All the infrastructure including right of way shall be proposed for double railway track

Upon its reconstruction and expansion, transport capacity and service quality of the railway will be greatly promoted. Then, it will actively promote and improve the development and utilization of land and tourism resources along the line and play a significant role in industrial & agricultural development and optimization & adjustment of industrial layout along the line.

 

Assignment Information

Assignment Name:
F/S & Design of (a) improvement & Rehabilitation Dodba to Sheringal Sawnai Road (15-Km) I/C 04-Nos Bridges (b) Construction of RCC Bridge at Kotkay U/C Sultan Khel District Upper Dir (2014-15)
ADP No- 779/140997 (2014-15)
778 Dodba
Approx. value of the Project (in current US$/PKR): PKR: 380 Million
Country: Pakistan
Location within country: District Upper Dir
Duration of assignment (Months): 24
Name of Client: Communication & Works Department Dir Upper
Total No of-staff months of the assignment: 144
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to all the nearby places of Dir Upper.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

 

Assignment Information

Assignment Name:
F/S & Design of Improvement Rehabilitation of Dodba to Sheringal Swani Road 15-Km
ADP No. 778/140979 (2014-15)
778 Sheringsl
Approx. value of the Project (in current US$/PKR): PKR: 380 Million
Country: Pakistan
Location within country: District Swat
Duration of assignment (Months): 24
Name of Client: Communication & Works Department District Swat
Total No of-staff months of the assignment: 150
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to the remote pockets.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

 

Assignment Information

Assignment Name:

F/S, Design & Construction of road RCC bridge near Muradpur District Mansehra (PK-55) ADP No. 908/140674(2014-15)

F/S, Design & Construction of Sabir Shah Nakot bridge District Mansehra ADP No. 909/140675(2014-15)

F/S, Design & Construction of sum bridge District Mansehra ADP No. 910/140676 (2014-15)

images (5)
Approx. value of the Project (in current US$/PKR): PKR: 365 Million
Country: Pakistan
Location within country: District Mansehra
Duration of assignment (Months): 22
Name of Client: Communication & Works Department District Mansehra
Total No of-staff months of the assignment: 253
Description of Project:

The road connects to the district headquarter of Mansehra to the second biggest town of the district.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

Detailed construction supervision involving qualitative control for the road embankment, pavement and the required structures.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

 

Assignment Information

Assignment Name:

F/S, Design & Construction/Improvement of road (A) Kulhari Gharbi road (2.50 KMS) (B) PCC road from GHSS Baffa to Kharah (Kulhari Sharoi) road District Mansehra (PK-55) ADP No. 907/140670 (2014-15)

F/S, Design & improvement of road from Khaki to Afzal Abad District Mansehra ADP No.911/140707 (2014-15)

F/S, Design & Construction of road (A) Chor Kalan road (B) Jabbori to Methal Kayian road via Banda Jee Such District Mansehra ADP No. 912/140920 (2014-15)

912222
Approx. value of the Project (in current US$/PKR): PKR: 359 Million
Country: Pakistan
Location within country: District Mansehra
Duration of assignment (Months): 24
Name of Client: Communication & Works Department District Mansehra
Total No of-staff months of the assignment: 288
Description of Project:

The road connecting the city centres to the rural and sub-urbans areas of Mansehra district.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

Detailed construction supervision involving qualitative control for the road embankment, pavement and the required structures.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

 

Assignment Information

Assignment Name:

Feasibility Study & Design and Construction of Road I/C 03 No. Bridges along right Bank River Jehlum from Phalair to Kohala (35-KM) District Abbottabad Changed to Feasibility study, Design of Road I/C 03 No. of Bridges along Right Bank of River Jehlum from Phalair to Kohala (35-KM) District Abbottabad

ADP No. 1089/150887 (2016-17)

Phalair
Approx. value of the Project (in current US$/PKR): PKR: 127.5 Million
Country: Pakistan
Location within country: District Abbottabad
Duration of assignment (Months): 03
Name of Client: Communication & Works Department District Abbottabad
Total No of-staff months of the assignment: 32
Description of Project:

This project was aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to the near villages of Khyber Pakhtunkhwa.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey & Mapping
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design

 

Assignment Information

Assignment Name:

Feasibility Study & Design and Construction of Road I/C 03 No. Bridges along right Bank River Jehlum from Phalair to Kohala (35-KM) District Abbottabad Changed to Feasibility study, Design of Road I/C 03 No. of Bridges along Right Bank of River Jehlum from Phalair to Kohala (35-KM) District Abbottabad

ADP No. 1089/150887 (2016-17)

1089 Phalair
Approx. value of the Project (in current US$/PKR): PKR: 127.5 Million
Country: Pakistan
Location within country: District Abbottabad
Duration of assignment (Months): 06
Name of Client: Communication & Works Department District Abbotabad
Total No of-staff months of the assignment: 39
Description of Project:

This project was aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to the near villages of Khyber Pakhtunkhwa.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey & Mapping
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design

 

Assignment Information

Assignment Name:
F/S Design construction of AYUN Bridge District Chitral.
ADP No. 1046/140984
9 No of Bridges
Approx. value of the Project (in current US$/PKR): PKR: 128 Million
Country: Pakistan
Location within country: District Chitral
Duration of assignment (Months): 02
Name of Client: Communication & Works Department Chitral
Total No of-staff months of the assignment: 16
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to all the nearby places.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

 

Assignment Information

Assignment Name:

Feasibility Study & Design and Construction of Road from Changla to Islamabad District Abbottabad

ADP No. 1124/160626

changla gali
Approx. value of the Project (in current US$/PKR): PKR: 105 Million
Country: Pakistan
Location within country: District Abbottabad
Duration of assignment (Months): 03
Name of Client: Communication & Works Department District Abbottabad
Total No of-staff months of the assignment: 27
Description of Project:

This project was aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to the near villages of Khyber Pakhtunkhwa.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey & Mapping
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Drainage & Erosion works

 

Assignment Information

Assignment Name:

Feasibility Study & Detailed Engineering Design for reconstruction of bridge at Tauheed Abad, District Peshawar – Naguman section of provincial highway S1.ADP No. 1262/170577 (2017-18)

Hariput Thalikot Bridge
Approx. value of the Project (in current US$/PKR): PKR: 100 Million
Country: Pakistan
Location within country: Tauheed Abad, District Peshawar
Duration of assignment (Months): 01
Name of Client: Pukhtunkhwa Highway Authority (PKHA) Peshawar
Total No of-staff months of the assignment: 09
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to all the nearby places.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Topographic Survey
  • Feasibility Study
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

 

Assignment Information

Assignment Name:

1) Feasibility Study & Design of Qaland Abad Bypass Road (4-KM) District Abbottabad

ADP No. 1121/160625 (2016-17)

2) Feasibility Study, Design & Supervision of Mansehra Bypass Road District Mansehra

ADP No. 1120/160624 (2016-17)

Qalandar abad
Approx. value of the Project (in current US$/PKR): PKR: 91 Million
Country: Pakistan
Location within country: District Abbottabad & Mansehra
Duration of assignment (Months): 02
Name of Client: Communication & Works Department District Abbottabad & Mansehra
Total No of-staff months of the assignment: 09
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route.

Description of actual services provided in the assignment:

The following services have been provided by our firm.
Detailed construction supervision involving qualitative control for the road embankment, pavement and the required structures.

 

Assignment Information

Assignment Name:

Feasibility Study, Design & Rehabilitation of Mingora Jambil Gokand Road District Swat

ADP No. 1003/140970

Jambil Gokand
Approx. value of the Project (in current US$/PKR): PKR: 77 Million
Country: Pakistan
Location within country: District Swat, Mingora
Duration of assignment (Months): 01
Name of Client: Communication & Works Department District Swat
Total No of-staff months of the assignment: 07
Description of Project:

This project was aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to the near villages of District Swat and Khyber Pakhtunkhwa.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

SES was contracted to prepare, deailed architectural, structural drawings, Bill Of Quantities (BOQ’s), specifications, engineering estimates and detailed construction supervision.

Detailed Design


Assignment Information

Assignment Name:

24 Roads Design Package

24 roads
Approx. value of the Project (in current US$/PKR): PKR: 155.55 Million
Country: Pakistan
Location within country: District Peshawar District Charsadda District Nowshera District Mardan
Duration of assignment (Months): 6
Name of Client: Japan International Cooperation Agency (JICA)
Total No of-staff months of the assignment: 355
Description of Project:

The devastating floods of July-August 2010 caused severe damages to the infrastructure in entire Khyber Pakhtunkhwa. A number of public sector buildings, bridges and, roads are either totally washed away by the flood waters or caused major damages. In fact these summer floods of 2010 produced Pakistan’s worst flooding in 80-years. The firm was engaged as consultants for the study and detailed design of the 24 roads and few interchanges/flyovers as part of the JICA Development Programme. Total length of the road package was 104 Kms in the 4 Districts mostly within the province Khyber Pakhtunkhwa.The study and design, scheduled for completion in June 2012 would rehabilitate the roads and provide free flow and efficient movement of traffic..

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Detailed Design using AASHTO and British Road Note No.31.
  • Reconnaissance Survey
  • Topographic Survey
  • Soil Investigation
  • Material Survey And Testing
  • Geotechnical Investigation Report
  • Hydrology And Hydraulic Study
  • Inception Report
  • Pavement Design
  • Environmental Impact Assessment Study
  • Detailed Draingae and Sewerage Design
  • Construction Supervision
  • Project Planning
  • Tender Documents
  • Review/Evaluation

Assignment Information

Assignment Name:

Feasibility Study & Design and Construction of Road I/C 03 No. Bridges along right Bank River Jehlum from Phalair to Kohala (35-KM) District Abbottabad Changed to Feasibility study, Design of Road I/C 03 No. of Bridges along Right Bank of River Jehlum from Phalair to Kohala (35-KM) District Abbottabad

ADP No. 1089/150887 (2016-17)

Phalair
Approx. value of the Project (in current US$/PKR): PKR: 127.5 Million
Country: Pakistan
Location within country: District Abbottabad
Duration of assignment (Months): 06
Name of Client: Communication & Works Department District Abbotabad
Total No of-staff months of the assignment: 39
Description of Project:

This project was aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to the near villages of Khyber Pakhtunkhwa.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey & Mapping
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design

 

Assignment Information

Assignment Name:

Feasibility Study & Design and Construction of Road I/C 03 No. Bridges along right Bank River Jehlum from Phalair to Kohala (35-KM) District Abbottabad Changed to Feasibility study, Design of Road I/C 03 No. of Bridges along Right Bank of River Jehlum from Phalair to Kohala (35-KM) District Abbottabad

ADP No. 1089/150887 (2016-17)

Phalair
Approx. value of the Project (in current US$/PKR): PKR: 127.5 Million
Country: Pakistan
Location within country: District Abbottabad
Duration of assignment (Months): 03
Name of Client: Communication & Works Department District Abbottabad
Total No of-staff months of the assignment: 32
Description of Project:

This project was aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to the near villages of Khyber Pakhtunkhwa.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey & Mapping
  • Soil Investigation<
  • Hydraulic Studies
  • Structural Design

 

Assignment Information

Assignment Name:
F/S Design construction of AYUN Bridge District Chitral.
ADP No. 1046/140984
9 No of Bridges
Approx. value of the Project (in current US$/PKR): PKR: 128 Million
Country: Pakistan
Location within country: District Chitral
Duration of assignment (Months): 02
Name of Client: Communication & Works Department Chitral
Total No of-staff months of the assignment: 16
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to all the nearby places.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

 

Assignment Information

Assignment Name:

Feasibility Study & Design and Construction of Road from Changla to Islamabad District Abbottabad

ADP No. 1124/160626

changla gali
Approx. value of the Project (in current US$/PKR): PKR: 105 Million
Country: Pakistan
Location within country: District Abbottabad
Duration of assignment (Months): 03
Name of Client: Communication & Works Department District Abbottabad
Total No of-staff months of the assignment: 27
Description of Project:

This project was aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to the near villages of Khyber Pakhtunkhwa.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey & Mapping
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Drainage & Erosion works

 

Assignment Information

Assignment Name:

Feasibility Study & Detailed Engineering Design for reconstruction of bridge at Tauheed Abad, District Peshawar – Naguman section of provincial highway S1.ADP No. 1262/170577 (2017-18)

Hariput Thalikot Bridge
Approx. value of the Project (in current US$/PKR): PKR: 100 Million
Country: Pakistan
Location within country: Tauheed Abad, District Peshawar
Duration of assignment (Months): 01
Name of Client: Pukhtunkhwa Highway Authority (PKHA) Peshawar
Total No of-staff months of the assignment: 09
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to all the nearby places.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Topographic Survey
  • Feasibility Study
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

 

Assignment Information

Assignment Name:

1) Feasibility Study & Design of Qaland Abad Bypass Road (4-KM) District Abbottabad

ADP No. 1121/160625 (2016-17)

2) Feasibility Study, Design & Supervision of Mansehra Bypass Road District Mansehra

ADP No. 1120/160624 (2016-17)

Qalandar abad
Approx. value of the Project (in current US$/PKR): PKR: 91 Million
Country: Pakistan
Location within country: District Abbottabad & Mansehra
Duration of assignment (Months): 02
Name of Client: Communication & Works Department District Abbottabad & Mansehra
Total No of-staff months of the assignment: 09
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route.

Description of actual services provided in the assignment:

The following services have been provided by our firm.
Detailed construction supervision involving qualitative control for the road embankment, pavement and the required structures.

 

Assignment Information

Assignment Name:

Construction of Karak Sabir Abad shakardara Road

karak
Approx. value of the Project (in current US$/PKR): PKR: 13.75 Million
Country: Pakistan
Location within country: Distt Karak
Duration of assignment (Months): 30
Name of Client: Frontier Highways Authority, Peshawar
Total No of-staff months of the assignment: 240
Description of Project:

The road connects to the district headquarter of Karak to the second biggest town of the district.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

Detailed Construction Supervision involving qualitative control for the road embankment, pavement and the required structures.

Assignment Information

Assignment Name:

Feasibility Study, Design & Rehabilitation of Mingora Jambil Gokand Road District Swat

ADP No. 1003/140970

Jambil Gokand
Approx. value of the Project (in current US$/PKR): PKR: 77 Million
Country: Pakistan
Location within country: District Swat, Mingora
Duration of assignment (Months): 01
Name of Client: Communication & Works Department District Swat
Total No of-staff months of the assignment: 07
Description of Project:

This project was aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to the near villages of District Swat and Khyber Pakhtunkhwa.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

SES was contracted to prepare, deailed architectural, structural drawings, Bill Of Quantities (BOQ’s), specifications, engineering estimates and detailed construction supervision.

Assignment Information

Assignment Name:

a) ADP NO. 620 (2007-08) Package (112 BRIDGES)

b) ADP NO. 466 (2007-08) Package (39 BRIDGES)

ADP
Approx. value of the Project (in current US$/PKR): PKR: 61.33 Million
Country: Pakistan
Location within country: FATA Mohmand, Kurram, South Waziristan, North Waziristan, Bajour, Khyber, Orakzai, FR. Bannu, FR. Tank, FR. D.I Khan, FR. Lakki.
Duration of assignment (Months): 36
Name of Client: FATA, Works & Service Department Peshawar
Total No of-staff months of the assignment: 364
Description of Project:

Design and Construction Supervision of over 151 RCC bridges of various spans and lengths from 10 meters upto 350 meters in N.W.F.P, Federally Administrated Tribal Areas of (FATA) of Pakistan.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Detailed Design using AASHTO and British Road Note No.31.
  • Reconnaissance Survey
  • Topographic Survey
  • Soil Investigation
  • Hydrological Survey
  • Geometric Studies
  • Structural Design
  • Geotechnical Investigations
  • Protection/ Training Works
  • Tender Documentations
  • Construction Documentations
  • Detailed Supervision

Assignment Information

Assignment Name:
Construction of RCC Bridge at Guldok Dhamtor District Abbotabad (90 Meters)
ADP No. 1162/150861
Guldok
Approx. value of the Project (in current US$/PKR): PKR: 50 Million
Country: Pakistan
Location within country: Guldok Dhamtor, District Abbottabad
Duration of assignment (Months): 03
Name of Client: Communication & Works Department District Abbottabad
Total No of-staff months of the assignment: 15
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to all the nearby places.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

Assignment Information

Assignment Name:
Provision for Rehabilitation of flood/torrential affected roads & bridges (SDG)
ADP No. 1168/160498 (2016-17)Restoration/ Reconstruction of Shalfalam bridge on river Panjkora, Dir Lower.
9 No of Bridges
Approx. value of the Project (in current US$/PKR): PKR: 50 Million
Country: Pakistan
Location within country: Dir Lower
Duration of assignment (Months): 01
Name of Client: Communication & Works Department District Dir Lower
Total No of-staff months of the assignment: 06
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to all the nearby places.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

Assignment Information

Assignment Name:

14 Roads Design Package

14 Roads Design
Approx. value of the Project (in current US$/PKR): PKR: 11.85 Million
Country: Pakistan
Location within country: Distt Bannu Distt Orakzai Distt FR Lakhi Distt FR Kohat
Duration of assignment (Months): 6
Name of Client: USAID/Pakistan
Total No of-staff months of the assignment: 140
Description of Project:

The firm was engaged as consultants for the feasibility study and detailed design of the 14 roads and few interchanges/flyovers as part of the USAID Development Programme. Total length of the road package is 77 Kms in the 5 Districts mostly in federally administered area(FATA). The new roads would provide efficient movement of traffic between Kohat to Bannu.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Detailed Design using AASHTO and British Road Note No.31.
  • Project Planning
  • Tender Documents
  • Review/Evaluation

Assignment Information

Assignment Name:

Dualization of Naguman Charsadda Road

naguman
Approx. value of the Project (in current US$/PKR): PKR: 10.50 Million
Country: Pakistan
Location within country: Distt Charsadda
Duration of assignment (Months): 24
Name of Client: Frontier Highways Authority, Peshawar
Total No of-staff months of the assignment: 220
Description of Project:

The road is a provincial highway with very high traffic intensity during morning and evening. The provincial govt therefore decided to convert it from a 2-lane highway to 4- lane. Keeping in consideration the traffic load its pavement is also strengthen. Its length is 15 km connecting the Charsadda District Headquarter with Peshawar (the provincial Capital)

Description of actual services provided in the assignment:

The following services have been provided by our firm.

Detailed Construction Supervision involving qualitative control for the road embankment, pavement and the required structures. Approval of monthly progress payments and QC/QA of construction materials, construction methodology and work execution as per specifications.

Assignment Information

Assignment Name:

Construction of Mingora Bypass Road

Mingora bypass
Approx. value of the Project (in current US$/PKR): PKR: 7.50 Million
Country: Pakistan
Location within country: Distt Swat
Duration of assignment (Months): 24
Name of Client: Frontier Highways Authority, Peshawar
Total No of-staff months of the assignment: 192
Description of Project:

The traffic to the picnic spots was all passing Mingora City. Therefore there was always traffic congestion in the city. To avoid that, the Govt of NWFP through FHA decided to construct a road, bypassing the city centre, namely Mingora Bypass Road.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

Detailed Construction Supervision involving qualitative control for the road embankment, pavement and the required structures. Approval of monthly progress payments and QC/QA of construction materials, construction methodology and work execution as per specifications.

Construction Supervision


Assignment Information

Assignment Name:

Widening and carpeting of Booni Buzand Torkhow road (28-Km) District Chitral

ADP No. 782/90417 (2014-15)

782 Chitral
Approx. value of the Project (in current US$/PKR): PKR: 640.3 Million
Country: Pakistan
Location within country: District Chitral
Duration of assignment (Months): 24
Name of Client: Communication & Works Department District Chitral
Total No of-staff months of the assignment: 342
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route.

Description of actual services provided in the assignment:

The following services have been provided by our firm.
Detailed construction supervision involving qualitative control for the road embankment, pavement and the required structures.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

 

Assignment Information

Assignment Name:

Feasibility Study, Design & Rehabilitation of Mingora Jambil Gokand Road District Swat

ADP No. 1003/140970

Jambil Gokand
Approx. value of the Project (in current US$/PKR): PKR: 412 Million
Country: Pakistan
Location within country: District Swat, Mingora
Duration of assignment (Months): 18
Name of Client: Communication & Works Department District Swat
Total No of-staff months of the assignment: 190
Description of Project:

This project was aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to the near villages of Khyber Pakhtunkhwa.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

SES was contracted to prepare, deailed architectural, structural drawings, Bill Of Quantities (BOQ’s), specifications, engineering estimates and detailed construction supervision.

 

Assignment Information

Assignment Name:
Design & Construction of Mardan Bye Pass Road from Rashakai Interchange to Jalala (Missing Links 8 KMS)
ADP No. 958/150230 (2015-16)
Mardan Bypass
Approx. value of the Project (in current US$/PKR): PKR: 386.7 Million
Country: Pakistan
Location within country: District Mardan
Duration of assignment (Months): 12
Name of Client: Communication & Works Department District Mardan
Total No of-staff months of the assignment: 192
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to the remote pockets.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

 

Assignment Information

Assignment Name:

(A) Rehabilitation of 09 No. roads and 09 bridges due to flood during July-Aug-2015 District Chitral

SH: – Rehabilitation of 09 bridges.

(B) Provision of rehabilitation of flood torrential affected roads & bridges (SDG)

ADP No. 1168/140498 (2016-17)

SH: – Construction of RCC bridge Kosht at Buni District Chitral.

9 No of Bridges
Approx. value of the Project (in current US$/PKR): PKR: 380.66 Million
Country: Pakistan
Location within country: District Chitral
Duration of assignment (Months): 15
Name of Client: Communication & Works Department Chitral
Total No of-staff months of the assignment: 234
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to all the nearby places.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

Assignment Information

Assignment Name:
F/S & Design of (a) improvement & Rehabilitation Dodba to Sheringal Sawnai Road (15-Km) I/C 04-Nos Bridges (b) Construction of RCC Bridge at Kotkay U/C Sultan Khel District Upper Dir (2014-15)
ADP No- 779/140997 (2014-15)
778 Dodba
Approx. value of the Project (in current US$/PKR): PKR: 380 Million
Country: Pakistan
Location within country: District Upper Dir
Duration of assignment (Months): 24
Name of Client: Communication & Works Department Dir Upper
Total No of-staff months of the assignment: 144
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to all the nearby places of Dir Upper.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

Assignment Information

Assignment Name:
F/S & Design of Improvement Rehabilitation of Dodba to Sheringal Swani Road 15-Km
ADP No. 778/140979 (2014-15)
778 Dodba
Approx. value of the Project (in current US$/PKR): PKR: 380 Million
Country: Pakistan
Location within country: District Swat
Duration of assignment (Months): 24
Name of Client: Communication & Works Department District Swat
Total No of-staff months of the assignment: 150
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to the remote pockets.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

Assignment Information

Assignment Name:

F/S, Design & Construction of road RCC bridge near Muradpur District Mansehra (PK-55) ADP No. 908/140674(2014-15)

F/S, Design & Construction of Sabir Shah Nakot bridge District Mansehra ADP No. 909/140675(2014-15)

F/S, Design & Construction of sum bridge District Mansehra ADP No. 910/140676 (2014-15)

images (5)
Approx. value of the Project (in current US$/PKR): PKR: 365 Million
Country: Pakistan
Location within country: District Mansehra
Duration of assignment (Months): 22
Name of Client: Communication & Works Department District Mansehra
Total No of-staff months of the assignment: 253
Description of Project:

The road connects to the district headquarter of Mansehra to the second biggest town of the district.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

Detailed construction supervision involving qualitative control for the road embankment, pavement and the required structures.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

Assignment Information

Assignment Name:

F/S, Design & Construction/Improvement of road (A) Kulhari Gharbi road (2.50 KMS) (B) PCC road from GHSS Baffa to Kharah (Kulhari Sharoi) road District Mansehra (PK-55) ADP No. 907/140670 (2014-15)

F/S, Design & improvement of road from Khaki to Afzal Abad District Mansehra ADP No.911/140707 (2014-15)

F/S, Design & Construction of road (A) Chor Kalan road (B) Jabbori to Methal Kayian road via Banda Jee Such District Mansehra ADP No. 912/140920 (2014-15)

912222
Approx. value of the Project (in current US$/PKR): PKR: 359 Million
Country: Pakistan
Location within country: District Mansehra
Duration of assignment (Months): 24
Name of Client: Communication & Works Department District Mansehra
Total No of-staff months of the assignment: 288
Description of Project:

The road connecting the city centres to the rural and sub-urbans areas of Mansehra district.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

Detailed construction supervision involving qualitative control for the road embankment, pavement and the required structures.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

Assignment Information

Assignment Name:
(1) Construction of RCC Bridge at Swausar Kasal Gulibagh and Sro Manzai Upper Dir
ADP No. 1141/150988 (2015-16)
(2) Construction of Bridge at Patrak Kumrat Road Upper Dir ADP No. 1144/151082 (2015-16)
1144 Patrak Kumrat
Approx. value of the Project (in current US$/PKR): PKR: 248.7 Million
Country: Pakistan
Location within country: District Upper Dir
Duration of assignment (Months): 24
Name of Client: Communication & Works Department Dir Upper
Total No of-staff months of the assignment: 144
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route. It will also provide access to all the nearby places.

Description of actual services provided in the assignment:

The following services have been provided by our firm.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision

Assignment Information

Assignment Name:

Construction of Thalikot Bridge at Jhari Kass Road, Distruct Haripur.

ADP No. 1262/170577 (2017-18)

Hariput Thalikot Bridge
Approx. value of the Project (in current US$/PKR): PKR: 124.13 Million
Country: Pakistan
Location within country: District Haripur
Duration of assignment (Months): 12
Name of Client: Communication & Works Department District Haripur
Total No of-staff months of the assignment: 36
Description of Project:

This project is aimed at improving the communication network in the area by providing all weather fair route.

Description of actual services provided in the assignment:

The following services have been provided by our firm.
Detailed construction supervision involving qualitative control for the road embankment, pavement and the required structures.

  • Feasibility Study
  • Topographic Survey
  • Soil Investigation
  • Hydraulic Studies
  • Structural Design
  • Protection / Training Works
  • Top Supervision