Assignment Information |
|
Assignment name: | Design of Ghazi Aman-ulla Township |
Approx. value of the Project (in current US$): | 200 Million |
Country: | Afghanistan |
Location within country: | Jalalabad |
Duration of assignment (months): | 12 |
Name of Client: | Mr. Najeeb Zarab |
Total No of-staff months of the assignment: | 390 |
Description of Project:
The project includes feasibility Study, Detailed Engineering Design of Ghazi Aman Ullah township with an area of 40,000 Kanal at Afghanistan. Ghazi Amanullah Khan city is a new city currently under construction in Nangarhar province of Afghanistan. It’s located around 20 km to the east of Jalalabad city. Ghazi Amanullah Khan city is the only and first modern city being built in Afghanistan with all facilities. It’s built by Najeeb Zarab construction company.Project components include:
|
|
Description of actual services provided in the assignment:
The firm completed the following tasks under this assignment:
|
Assignment Information |
|
Assignment name: | Identification of Small Dams along Tochi andKaito Rivers NWA FATA |
Approx. value of the Project (in current US$): | 80, 000 |
Country: | Pakistan |
Location within country: | FATA |
Duration of assignment (months): | 80 |
Name of Client: | Irrigation Department |
Total No of-staff months of the assignment: | 40 |
Description of Project:
The scope of services for the Feasibility study is to carry out topographic survey and mapping,surface geological survey and Geo-physical survey, sub surface investigation, laboratory and filed testing, hydraulic model studies, hydrological survey and data collection, transmission line investigation and route survey, environmental and social impact assessment, preparation of bill of quantities / cost estimates for all components, economic and financial analysis and preparation of PC-1s. |
Assignment Information |
|
Assignment name: | Study of Water Supply System of Peshawar |
Approx. value of the Project (in current PKR): | 100 Million |
Country: | Pakistan |
Location within country: | Peshawar |
Duration of assignment (months): | 6 |
Name of Client: | CDM (USAID) |
Total No of-staff months of the assignment: | 110 person months |
Description of Project:
The project includes study of existing water supply schemes of Peshawar. Study included length, dia. and condition of existing water distribution system. Identification of water storage and pumping locations and assessment of water demand by comparison of the gap between demand and supply. Identification of availability of potential new sources and their feasibility. |
|
Description of actual services provided by your staff within the assignment:
The firm completed the following tasks under this assignment:
|
Assignment Information |
|
Assignment name: | Review of Feasibility Study, Detail Design of Sangao, Small Dam, District Mardan, NWFP |
Approx. value of the Project (in current US$): | 150 Million |
Country: | Pakistan |
Location within country: | Mardan |
Duration of assignment (months): | 9 |
Name of Client: | Irrigation Deptt NWFP |
Total No of-staff months of the assignment: | 250 |
Description of Project:
The Small Dams Organization Irrigation and Power Department, Govt. of NWFP intends to engage consultants for review of feasibilities studies, detail design and construction supervision of Sangao, Small Dams District Mardan. Under these TOR, the services to be performed by the consultants shall be as under:
|
|
Description of actual services provided by your staff within the assignment:
The firm is carrying out review of feasibilities studies including review of all existing surveys of the reservoir and distribution system, field investigation, reports and earlier conducted studies. As part of these assignment hydrological studies, including water availability studies, sediment inflow studies, flood studies and flood routing studies, geotechnical, social and Environment Impact studies will also be carries out. |
Assignment Information |
|
Assignment name: | Remodeling of Warsak Canal Systems |
Approx. value of the Project (in current US$): | 465 Million |
Country: | Pakistan |
Location within country: | Peshawar |
Duration of assignment (months): | 2 |
Name of Client: | Irrigation Deptt NWFP |
Total No of-staff months of the assignment: | 50 |
Description of Project:
The scope of services for the Feasibility study for remodeling is to carry out topographic survey and mapping, surface geological survey and Geo-physical survey, sub surface investigation, laboratory and filed testing, hydraulic model studies, hydrological survey and data collection, transmission line investigation and route survey, environmental and social impact assessment, preparation of bill of quantities / cost estimates for all components, economic and financial analysis and preparation of PC-1s.As well as rendered Detailed Engineering Design and Construction Management Services. |
Assignment Information |
|
Assignment name: | Lawrencepur Small Dam |
Approx. value of the Project (in current US$): | 700 Million |
Country: | Pakistan |
Location within country: | Punjab Province |
Duration of assignment (months): | 6 |
Name of Client: | Irrigation & Power Deptt., Govt. of the Punjab |
Total No of-staff months of the assignment: | 90 |
Narrative description of Project:
Feasibility Studies, Detailed Engineering Design and Construction Management Services |
|
Description of actual services provided in the assignment:
The scope of services for the Feasibility study is to carry out topographic survey and mapping, surface geological survey and Geo-physical survey, sub surface investigation, laboratory and filed testing, hydraulic model studies, hydrological survey and data collection, transmission line investigation and route survey, environmental and social impact assessment, preparation of bill of quantities / cost estimates for all components, economic and financial analysis and preparation of PC-1s.As well as rendered Detailed Engineering Design and Construction Management Services. |
Assignment Information |
|
Assignment name: | Pehur Hydropower Project NWFP |
Approx. value of the Project (in current US$): | 700 Million |
Country: | Pakistan |
Location within country: | Peshawar |
Duration of assignment (months): | 5 |
Name of Client: | Government of NWFP |
Total No of-staff months of the assignment: | 50 |
Narrative description of Project:
Feasibility Study, Detailed Engineering Design and Construction Management Services. |
|
Description of actual services provided in the assignment:
The scope of services for the Feasibility study is to carry out topographic survey and mapping, surface geological survey and Geo-physical survey, sub surface investigation, laboratory and filed testing, hydraulic model studies, hydrological survey and data collection, transmission line investigation and route survey, environmental and social impact assessment, preparation of bill of quantities / cost estimates for all components, economic and financial analysis and preparation of PC-1s. As well as rendered Detailed Engineering Design and Construction Management Services. |